The Bugey Nuclear Power Plant is located in Bugey in the Saint-Vulbas commune (Ain), about 75 km from the Swiss border. The site occupies 100 hectares. It is on the edge of the Rhône River, from where it gets its cooling water, and is about 35 km upstream from Lyon and 72 km from Grenoble. About 1,200 people work at the site.

The site houses 4 currently operating units, all being pressurized water reactors. The 5th reactor (unit 1) is currently being dismantled. It was the last UNGG reactor built in the world.

Some of the cooling comes from direct use of the Rhône water (units 2 and 3) while some is done by the use of cooling towers (units 4 and 5).

Seismic activity

The area is not known for its seismic activity.

In the last few years, the plant was modernized to updated earthquake resistance standards.

Heat dumping

During the heat wave on 20 July 2003, waste heat water was piped into the Rhône, which is permitted, in extreme cases, for about 2 hours and the maximum heat difference was 0.9 degrees Celsius. Again on 30 July 2003, water was directly discharged into the Rhône for 9 hours.

Reactor units

Bugey 5 was offline from August 2015 to July 2017 due to an air leak in the inner liner of its containment.[4][5]

References

  1. ^ Power Reactor Information System from IAEA: "France (French Republic): Nuclear Power Reactors" (in English)
  2. ^ The French Nuclear Safety Authority Archived 25 June 2020 at the Wayback Machine (in French)
  3. ^ "EDF's Bugey-5 nuclear reactor restarts after 23-month shutdown (France) | Enerdata".
  4. ^ "Bugey 5 containment repairs get regulatory approval". World Nuclear News. 5 April 2017. Retrieved 6 April 2017.
  5. ^ "Bugey 5 restarts following containment repairs". World Nuclear News. 27 July 2017. Retrieved 27 July 2017.