stringtranslate.com

Line 2 (Zhengzhou Metro)

Line 2 of the Zhengzhou Metro (Chinese: 郑州地铁二号线; pinyin: Zhèngzhōu Dìtiě Èr Hào Xiàn) is a rapid transit line running from north to south of Zhengzhou. It opened on 19 August 2016. The line is currently 30.9 km long with 22 stations.[3][1][2]

Through services are operated on Line 2 and Chengjiao line (part of future Line 9), although they are classified as separate lines.[4]

Map of Zhengzhou Metro Line 2

History

Interior of a train on Line 2

The first phase of the line began construction on 28 December 2010, and began operations on 19 August 2016.[5] The second phase of the line began operations on 28 December 2019.

Opening timeline

Stations

References

  1. ^ a b c "郑州地铁2号线19日开通 1、2号线换乘攻略". 2016-08-18.
  2. ^ a b c d "官宣!郑州地铁2号线二期12月28日开通试运营". 2019-12-26.
  3. ^ "郑州地铁2号线8月10日起开始试乘" (in Chinese). Xinhua. Archived from the original on January 18, 2017. Retrieved 18 January 2017.
  4. ^ "郑州地铁2号线将与城郊铁路实行大小交路套跑运行" (in Chinese). Xinhua. Retrieved 18 January 2017.
  5. ^ "郑州双地铁时代来了!". 河南分网. Retrieved 30 December 2017.