stringtranslate.com

Line 1 (Hefei Metro)

The Line 1 of Hefei Metro (Chinese: 合肥轨道交通一号线; pinyin: Héféi Guǐdào Jiāotōng Yī Hào Xiàn) is an underground metro line in Hefei. The line began operation on 26 December 2016.[1][2]

Opening timeline

Train service

There are 2 types of train services offered on the metro line 1:

Map


Stations

References

  1. ^ "翼猫科技强势入驻合肥地铁,翼猫号承载梦想,地铁随行" (in Chinese). China News. Retrieved 19 January 2017.
  2. ^ "安徽移动实现省内首条地铁网络全覆盖" (in Chinese). Xinhua. Archived from the original on January 31, 2017. Retrieved 19 January 2017.
  3. ^ "合肥地铁1号线三期7月1日开通运营". CNR. 2023-06-29. Retrieved 2023-06-29.
  4. ^ a b "地铁1号线三期上线"试跑"". 2023-03-21. 1号线三期工程是既有运营1号线的北延段,正线全长4.54公里,均为地下线
  5. ^ "轨道交通1号线合肥南站往合肥火车站方向加开1列次载客列车". hfgdjt.com. Retrieved 8 March 2018.