MTR Hyundai Rotem EMU

The Hyundai Rotem EMU (also known as R-Train or 1141B) (Chinese: 港鐵東鐵綫現代列車) is a current model of heavy rail electric multiple units used on the Mass Transit Railway in Hong Kong. The 9-car sets are manufactured by Hyundai Rotem for the North South Corridor, an extension of the East Rail line, at a cost of HK$4 billion.[2] and the first delivery took place in 2015, while a further 6 trains were ordered in May 2020, although the 6 trains were never manufactured.[3][4] Originally scheduled to enter service in late-2017 to early-2018, the trains gradually entered service from 6 February 2021.[5][6][7] All train sets were put into service in 2022, replacing the Metro Cammell EMUs and displacing the SP1900 EMUs to the Tuen Ma Line.[8]

Formation

The formation ranges from D001/D003 (Trainset 1) to D127/D129 (Trainset 43) Like the previous SP1900s and Metro Cammell EMUs, one car is still reserved for the first class in each train set. The 9-car formation is shorter than the previous 12-car East Rail Line trains, due to space constraints imposed by new underground platforms on the Sha Tin to Central Link. There are concerns that the new formation may worsen the existing overcrowding problem.[9][10] However, the Transport and Housing Bureau and MTRC suggest that the new signaling system and higher train speeds will increase the train frequency from three minutes down to two minutes. It was also estimated that with the completion of the Sha Tin to Central Link (Tai Wai – Hung Hom section), 20% of the current East Rail line passengers will take the new East West Corridor.

Design and features

First class compartment of the Hyundai Rotem EMU

The Hyundai Rotem EMU train will be more advanced than the existing trains.

References

  1. ^ "LCQ1: Alleviating the loading of MTR East Rail Line" (Press release). The Government of Hong Kong SAR. 15 June 2022. Retrieved 17 August 2022. [...] upon the commencement of service of the new signalling system of MTR East Rail Line (ERL) in February last year, ERL's maximum carrying capacity per hour per direction is 82 500 passenger trips
  2. ^ Barrow, Keith (19 December 2012). "MTR orders trains and signalling for Shatin – Central Link". International Railway Journal. Retrieved 28 July 2015.<name="mtr-media">"New Trains and Signalling System for the future Shatin to Central Link" (PDF). MTR (Press Release). 14 December 2012. Retrieved 28 July 2015.
  3. ^ "2nd MTR shipment successful delivery". Pioneer Logistics Group. 19 December 2015. Archived from the original on 5 October 2016. Retrieved 4 October 2016.
  4. ^ 港鐵公司. "沙中綫新列車九月起到港" (PDF). Retrieved 30 July 2015.
  5. ^ 沙中綫又一新里程 –「新隊員」加盟東鐵綫!, retrieved 29 August 2020
  6. ^ "東鐵9卡/12卡車混跑計劃". hkitalk.net 香港交通. Retrieved 31 May 2020.
  7. ^ "MTR Announces Launch of East Rail Line New Signalling System and 9-car Trains on 6 February and a Series of Measures to Enhance Shatin to Central Link Project Control" (PDF). Retrieved 1 February 2021.
  8. ^ "New Trains and Signalling System for the future Shatin to Central Link" (PDF). MTR (Press Release). 14 December 2012. Retrieved 28 July 2015.
  9. ^ "LCQ1: Crowdedness in MTR train compartments". Hong Kong Government Press Release. Retrieved 15 August 2016.
  10. ^ "東鐵線將減三卡車廂 市民質疑難加班次疏導". Stand News. Retrieved 15 August 2016.