Line 16 of the Beijing Subway (Chinese: 北京地铁16号线; pinyin: běijīng dìtiě shíliù hàoxiàn) is a rapid transit line in Beijing. It is 48.9 km (30.4 mi) in length[2] with 30 stations (29 stations in operation). The line is fully underground.
Construction began in December 2013. The northern section, from Bei'anhe to Xiyuan, was opened on 31 December 2016.[4] An infill station, Nongda Nanlu, was opened on 30 December 2017.[5] It extended to Ganjiakou on 31 December 2020, and extended to Yuyuantan East Gate on 31 December 2021. The southern section to Yushuzhuang opened on 31 December 2022.[6] The remainder of the line to Wanpingcheng opened on 30 December 2023.[7]
The line is operated by the Beijing MTR Corporation Limited and uses CNR Changchun DKZ93 and CSR Sifang SFM40 eight-car high-capacity wide-body Type A trains.[8] Line 16's color is dark-moderate green.
The line starts at the west end of Beiqing Road (北清路), just outside of the 6th Ring Road, and follows the road east to Yongfeng Road (永丰路) where it turns south towards the city. Line 16 follows Yongfeng Road south to Xiyuan, then continues south to the National Library and Yuyuantan Dongmen (Yuyuantan Park East Gate). It then continues south, passing through Muxidi, Daguanying, and turns west through Fengtai railway station, then west-southwest through Yushuzhuang before traversing slightly west north-west to end at Wanpingcheng.
In 2009, Line 16 was among the 198 major urban planning projects listed by Beijing's development and reform commission.[9] At that time, Line 16 was slated to run about 35 km (21.7 mi), from Huilongguan in Changping District to Huaxiang in Fengtai District.[9]
According to the June 2010 plans, the northern section of Line 16 will replace the originally planned Line 4 northern extension and run 48 km (29.8 mi) from Bei'anhe in Haidian District, south to Xiaoyueyuan, near the Lugou Bridge in Fengtai District.[10] The line would begin near Bei'anhe, and provide access to parts of Haidian, north of the foothills the Western Hills that extend into Haidian District. For this reason, that section of the line was also referred to as the Haidian Shanhou (literal translation: Haidian Back Mountain) Line because it begins on the backside of the low-lying range that extends from the Fragrant Hills to the Summer Palace.[10] Points of interest that the line may pass along the route to Xiaoyueyuan in the south include the Summer Palace, Haidian Gymnasium, National Library, Purple Bamboo Park, Beijing Zoo, Chegongzhuang West Road, Sanlihe, Wanshou Temple, Lize Shangwuqu (Lize Business District), and the Beijing Fengtai railway station.[10] The proposal was scaled back with the removal of the Haidian Shanhou section in December 2010, reducing the line to just 23 km (14.3 mi), from Suzhou Jie to Wanpingcheng. But the northern section was subsequently restored months later, bringing the line length 49 km (30.4 mi).[11]
The Beijing Municipal Commission of Urban Planning released the plans for several subway stations in 2013.[12] Construction of the line began in December 2013.[13]
The northern section, from Bei'anhe to Xiyuan, except for Nongda Nanlu, opened on December 31, 2016.[4] Nongda Nanlu opened on December 30, 2017.[5] In April 2020, the Beijing Municipal Commission of Development and Reform decided to build an infill station on the southern section of Line 16: Yushuzhuang North (now renamed to Hongtaizhuang).[14]
On December 31, 2020, the middle section from Xiyuan to Ganjiakou opened.[15] (Suzhou Jie and Erligou stations were not opened)
On December 31, 2021, a one-station extension to Yuyuantan Dongmen (Yuyuantan Park East Gate) opened.
On December 31, 2022, the southern section of Line 16 (from Yuyuantan Dongmen (Yuyuantan Park East Gate) to Yushuzhuang) opened.[6] (Lize Shangwuqu station was not opened)
On March 18, 2023, Erligou station started operation.
On December 30, 2023, the extension from Yushuzhuang to Wanpingcheng, and the infill station Suzhou Jie, started operation.[2][7]
List of stations from north to south.
The Northern and Middle sections of BJL16 recorded approximately 21 million passenger trips and average weekday patronage of approximately 140,000 in the first half of 2021
全长约14.2公里
2023年12月30日(周六)首班车起,地铁17号线北段(工人体育场—未来科学城北)、16号线剩余段(榆树庄—宛平城)及苏州街站、11号线西段剩余段(金安桥—模式口)开通试运营
"北京地铁16号线工程环境影响报告信息公告". 铁道第三勘察设计院集团有限公司. 8 April 2011. Retrieved 10 April 2011.
"北京地铁16号线工程环境影响报告书简本". 铁道第三勘察设计院集团有限公司. 26 October 2012. Retrieved 27 October 2012.
"地铁下月开工16号线". 京华时报、京华网. 17 February 2013.
"北京地铁十六号线二期(原海淀山后线)工程环境影响评价信息二次公示". 铁道第三勘察设计院集团有限公司. 10 December 2013. Retrieved 10 December 2013.