stringtranslate.com

Line 6 (Shanghai Metro)

Line 6 is an eastern north–south line of the Shanghai Metro network. It opened on December 29, 2007. The entire line is located in the Pudong New Area. A complete trip between the two end terminals, Gangcheng Road and Oriental Sports Center takes approximately 1 hour and 10 minutes. Line 6 has been dubbed the unofficial nickname “Hello Kitty Line” due to its lurid pink livery. The line is colored magenta on system maps.

History

Controversy

Like the Lexington Avenue Subway in New York City, passenger traffic has consistently exceeded the designed capacity of the line since its opening and causes severe strain to the services. The planning of Line 6 began in 2000, but real estate development along the proposed line happened faster than anticipated upon the line's initial opening. Uniquely at the time, a majority of the Line 6 opened in one phase creating a 30-kilometer (19 mi) long corridor overnight. Existing buses were cancelled or diverted simultaneously due to the opening of Line 6, forcing residents along the line to travel by rail transit. This was exacerbated by high initial train headways upon opening as all ordered rolling stock have not been completely delivered. Additionally, the line had relatively short operating hours leading to large number of passengers flooding into the first train.[2] Line 6 was initially forecasted to carry 105,000 people/day. However the aforementioned factors led to the ridership of the line to exceed 150,000 people/day during the first few days of operation.[3] Realizing the sheer miscalculation during construction, the municipal government have pledged to add new trains and shorten wait times starting in June 2008. However, Line 6 still suffers severe crowding and delays especially during rush hours with passenger flow growing faster than expected.[4] In 2012 the busiest section of the line was still running at 133% capacity.[5] With the opening of Line 12 the Shanghai Metro advises passengers divert to the new line to relieve crowding.[6] The line was built to accommodate light metro narrow-bodied "C size" trains with 4 carriages each, which is not interchangeable with wide-body "A size" trains with 6 to 8 carriages on other Shanghai Metro lines. This difference in loading gauge has made it impractical to upgrade the line to higher capacity "A size" trains to relieve demand. The platform length (especially at underground stations) has made it impractical to upgrade the line to accommodate more carriages.

Stations

Service routes


Important stations

Future expansion

There are no plans to extend the line.

Station name change

Headways

Technology

Signalling

Rolling Stock

The designed speed of the train is 80 km/h, the length (Class A carriages are longer at 23 meters) is 19.49 meters (Tc)/19.44 meters (Mp, M), and the width (Class A carriages are wider at 3.0 meters) is 2.6 meters.


References

  1. ^ "Metro breaks records" (in Chinese). Shanghai Metro 163 Official. 2019-03-09. Retrieved 2019-03-09.
  2. ^ Four reasons cause the line 6 to be full (originally published in "Oriental Morning Post"). news365.com.cn. 2008-01-03
  3. ^ "客流预测报告做出前内定小型车". Sina. Retrieved 2013-01-27.
  4. ^ "轨交拥挤排行榜:"6号线德平路到世纪大道站"最挤". Retrieved 2012-11-22.
  5. ^ "地铁限流知识". 文明地铁(安全地铁)宣传. 上海地铁运管中心. 2012-03-30. Retrieved 2013-03-09.
  6. ^ "12号线、16号线12月29日起载客试运营". 上海地铁运管中心. 2013-12-27. Retrieved 2013-12-28.
  7. ^ 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  8. ^ 上海地铁6号线将试运营 粉红为车厢主题颜色. Tencent (QQ) News. 2007-12-26.
  9. ^ 济阳路站更名为东方体育中心站. Sohu. 2011-05-08.
  10. ^ "Schedule" (in Chinese). Shanghai Metro. 2021-07-07. Retrieved 2021-07-07.
  11. ^ 上海地铁6号线车辆. 中车长春轨道客车有限公司 (in Chinese). Retrieved 2020-03-20.
  12. ^ 上海地铁6号线车辆. 中车长春轨道客车有限公司 (in Chinese). Retrieved 2020-03-20.